ProcuraInsights
Discover Procura

Open Procurement Tenders

393 open tenders across 14 African countries

Get weekly alerts
Construction×Clear all
Government
🇿🇦South Africa

PROCUREMENT OF A SERVICE PROVIDER: THE REPAIR AND REFURBISHMENT OF TSHIAME WASTEWATER TREATMENT WORKS

Construction1d left
Government
🇿🇦South Africa

REQUEST FOR PROPOSALS FOR THE APPOINTMENT OF A REPUTABLE SERVICE PROVIDER TO PROVIDE INFRASTRUCTURE AS A SERVICE, SD-WAN SOLUTION AND INTERNET CONNECTIVITY, INFRASTUCTURE AND EMAIL SECURITY, CONTACT CENTRE AS A SERVICE AND MICROSOFT TEAMS PHONE, SUPPORT AND MAINTENANCE FOR A PERIOD OF THREE (03) YEARS

Construction26 Jun 2026
Government
🇿🇦South Africa

Coastal Stormwater and Catchment Management Area Based Infrastructure Repairs Maintenance Contract as and when required for 36 months: Central Region

Construction26 Jun 2026
Government
🇿🇦South Africa

CONSULTING ENGINEERING SERVICES FOR THE TRAINING AND CONSTRUCTION MANAGEMENT SERVICES FOR A COMMUNITY DEVELOPMENT PROJECT TO UPGRADE ACCESS ROADS AND STORMWATER SYSTEM IN AND AROUND KWAMHLANGA NEAR NATIONAL ROAD R573 SECTION 2 FROM KM8.60 TO KM13.00

Construction30 Jun 2026
Government
🇿🇦South Africa

Routine Maintenance of the Municipal ICT Infrastructure and Support Provision for a period of 36 Months

Construction25 Jun 2026
Government
🇿🇦South Africa

DEMOLITION OF CONCRETE FLOORS AND CONSTRUCTION OF NEW CONCRETE FLOORS AT THE MOTOR WORKSHOP AND CONCRETE REPAIRS AT THE RESTAURANT: WESTLAKE CAMPUS

Construction29 Jun 2026
Government
🇿🇦South Africa

Request to extend Validity Period (NO.3) for the pre-qualification of a panel of ten (10) contractors for the construction and dismantling of High Voltage (HV) distribution lines for voltages ranging from 44kV up to and including 132kV. The panel will include refurbishment, strengthening and direct customer projects within Limlanga Cluster- Limpopo, on an “as and when” required basis over a period of 60 months

Construction30 Jun 2026
Government
🇿🇦South Africa

ELECTRICAL, MECHANICAL MAINTENANCE AND REFURBISHMENT OF WATER AND SEWER PUMP STATIONS AND WASTEWATER TREATMENT WORKS IN THE SALDANHA BAY MUNICIPALITY FOR THE PERIOD 01 JULY 2026 TO 30 JUNE 2029.

Construction3 Jul 2026
Government
🇿🇦South Africa

PANEL FOR THE SUPPLY AND DELIVERY OF CONCRETE WORKS MATERIAL / INVENTORY FOR A PERIOD OF THIRTY-SIX (36) MONTHS

Construction2d left
Government
🇿🇦South Africa

APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE CONSTRUCTION OF ANCILLIARY WORKS ON ROADS IMPLEMENTED THROUGH IN HOUSE CONSTRUCTION TEAMS FOR A PERIOD OF 36 MONTHS

Construction2d left
Government
🇿🇦South Africa

PROCUREMENT OF MOBILE/PORTABLE ABLUTIONS, GUARD HOUSES AND OFFICE UNITS FOR THE MADLANGA COMMISSION AT JUSTICE COLLEGE (BRIDGETTE MABANDLA BUILDING) FOR A PERIOD OF 10 MONTHS

Construction0d left
Government
🇿🇦South Africa

SUPPLY AND DELIVERY OF ROADWORK SERVICES FOR SALDANHA BAY MUNICIPALITY FOR THE PERIOD 01 JULY 2026 TO 30 JUNE 2029.

Construction3 Jul 2026
Government
🇿🇦South Africa

APPOINTMENT OF PANEL OF MAXIMUM FOUR (04) CONTRACTORS TO ASSIST WITH MINOR ELECTRICAL WORKS FOR THE 2026/27, 2027/28 AND 2028/29 FINANCIAL YEARS ON AN AS AND WHEN REQUIRED BASIS

Construction25 Jun 2026
Government
🇿🇦South Africa

RE-ADVERT : APPOINTMENT OF MAXIMUM OF THREE (03) CONTRACTORS ON THE PANEL FOR MAINTENANCE OF WATER AND WASTEWATER TREATMENT WORKS INFRASTRUCTURE AS AND WHEN REQUIRED FOR A PERIOD OF 36 MONTHS

Construction7d left
Government
🇿🇦South Africa

CONSTRUCTION OF MBOSHONGWENI/MFISHANE ROAD IN WARD 05

Construction30 Jun 2026
Government
🇿🇦South Africa

CONSTRUCTION OF WARD 01 SPORTFIELD-PHASE 3 COMPLETION

Construction2d left
Government
🇿🇦South Africa

THE DESIGN, DETAILED ENGINEERING, MANUFACTURE, TESTING AT WORKS, SUPPLY, DELIVERY, REMOVAL OF EXISTING TRANSFORMERS, PLACEMENT ON FOUNDATION, INSTALLATION, ERECTION, TESTING, COMMISSIONING, AND STORAGE OF CLASS 0 AND 1 POWER TRANSFORMERS ON AN “AS AND WHEN” REQUIRED BASIS FOR A PERIOD OF TEN YEARS.

Construction30 Jun 2026
Government
🇿🇦South Africa

TERM CONTRACT FOR DEEP CLEANING SERVICES TO ALL BUILDINGS OCCUPIED BY DEPARTMENT OF PUBLIC WORKS AND INFRASTRUCTURE OFFICIALS IN THE JOE GQABI DISTRICT FOR TWENTY FOUR (24) MONTHS

Construction1d left
Government
🇿🇦South Africa

PE NATIONAL FIRE SERVICES INFRASTRUCTURE AND EQUIPMENT UPGRADE PHASE 2A (CONSTRUCTION OF A NEW FIRE BUILDING)

Construction26 Jun 2026
Government
🇿🇦South Africa

UPGRADE AND REFURBISHMENT OF WINBURG WATER TREATMENT WORKS

Construction2d left
Government
🇿🇦South Africa

CONSTRUCTION OF THE EBENEZER OUTFALL SEWER

Construction26 Jun 2026
Government
🇿🇦South Africa

NEWTON RESERVOIR COMPLEX SECURITY AND ACCESS CONTROL – BUILDING WORKS (RE-ADVERT)

Construction7d left
Government
🇿🇦South Africa

Construction of 6KM Paved Roads with Stormwater Control in New Rest (Sterkspruit) (Ward 8 Phase 1)

Construction6d left
Government
🇿🇦South Africa

RFP NUMBER 04/2026 : THE REGRAVELLING OF VARIOUS GRAVEL ROADS IN MKUZE GAME RESERVES

Construction6d left
PreviousPage 12 of 17Next